Peak Rail is a preserved railway operating timetabled steam services for tourists and visitors to the Peak District and the Derbyshire Dales. It currently runs 2 miles between Matlock Riverside and Rowsley South. It hopes one day to re-extend a further 10 miles to Miller's Dale railway station (recreating 13 miles) in the near future.

Contents

[edit] History

Template:Peak Rail

In 1968 the former Midland Railway main line from London to Manchester (originally built as the Manchester, Buxton, Matlock and Midlands Junction Railway), was closed between Matlock and Chinley in Derbyshire, including the branch to Buxton. In 1975 the Peak Railway Preservation Society took matters in hand and, after opening a Steam Centre at Buxton (Subsequently sold to a supermarket chain for redevelopment), by 1991 had reopened the section of line between Matlock and Darley Dale. In 1997, this was extended to half a mile short of Rowsley village, with a new station constructed next to the site of the former goods yard at Rowsley South. Several railway preservation groups are based at the latter, often working in support of and cooperation with Peak Rail. For further details see Rowsley South railway station.

File:Peak rail.jpg
Peak Rail in relation to other lines

[edit] Motive Power

[edit] Operational Steam Locomotives

  • RSH 0-6-0ST No. 7136 (Carries No.WD150 "Royal Pioneer")

[edit] Steam Locomotives Undergoing Restoration

  • LMS 2-8-0 Class 8F no. 48624 - Nearing end of restoration, boiler removed for tubing and steam testing before reassembly, painting and running. Not expected to steam until 2009.

[edit] Steam Locomotives Undergoing Overhaul

  • RSH 0-6-0T No. 7597 "Zebedee" - Work ongoing, frames being repaired and wheels away for re-tyring, boiler in very good condition.

[edit] Stored Steam Locomotives

[edit] Operational Diesel Locomotives

[edit] Diesel Locomotives Undergoing Overhaul/Restoration

[edit] Stored Diesel Locomotives

[edit] Ongoing Projects

File:Darley1.JPG
Darley Dale in June 2007, looking north

The Engine Shed project has been ongoing for six years. Of April 2008, the roof and wall cladding is in place, many internal elements have been fitted, brickwork had progressed substantially and roller-shutter doors are about to be brought into operation. A revised completion date for the Engine shed is now Autumn 2008.

Negotiations for the lease of a further mile of trackbed to the North have finally resulted in a 99-year lease on the trackbed from Rowsley South to Rowsley village, whilst discussions regarding access to Matlock station Down Platform continue. Developments with the latter caused an unprecedented amount of speculation and concern in the local media in the first quarter of 2007, but since that time attention has focused on the extensive redevelopment of nearby Cawdor Quarry and the construction of the A6 relief road just north of Matlock. The latter has now been completed, but work reconnecting Peak Rail to Network Rail metals is currently on hold until full agreement has been reached on an Access Strategy and Method of Working for Peak Rail's services.

In late February 2007, the railway's 'Two-Train Running' project reached fruition and was approved by HM Railway Inspectorate. Through improvements to infrastructure and signalling, this project allows two trains in steam on the line, utilising a refurbished and extended passing loop at Darley Dale. The advantages of this enhancements has allowed the working of freight and passenger services on Special Event Days, with multiple passenger workings to follow in future operating seasons.

[edit] Work still outstanding

File:Riverside1.JPG
No.WD 150 'Royal Pioneer' at Matlock Riverside in June 2007

Essentially the former Manchester main line as it is can be considered in four sections:

From London via Derby to Ambergate Junction as the Midland Main Line

Overlapping this from Derby to Ambergate and on to Matlock as the Derwent Valley Line.

Peak Rail operates a section from Matlock to Rowsley and has an interest in the line onwards through Bakewell to Buxton station. From there, the line could follow the former LNWR line to Manchester although through trains would have to reverse, or extend from Millers Dale on its original route, to join the still-existing line to Chinley on the Hope Valley Line.

In 2004 Derbyshire County Council published a study which concluded that reopening the line for a local service was technically feasible and that the track bed should remain clear of development, but not an economic possibility in the near future.

Meanwhile the Derwent Valley Line, it is said, has been allowed to deteriorate both in infrastructure and quality of service and in 2005 a document was published by the Friends of the Derwent Valley Line, assisted by the County Council, arguing for improvements to the current service. Network Rail has stated its intention to carry out necessary repairs in 2008, which includes the strengthening or rebuilding of three bridges on the branch. Structural reviews took place early in 2008 and the work is scheduled to be completed by the latter part of the year.

[edit] See also

[edit] References

  1. Fox, Peter & Hall, Peter; Preserved Locomotives of British Railways, Platform 5, Sheffield, UK, 11th Edition 2002, pp. 66–67
  2. Industrial Railway Society; Industrial Locomotives, Industrial Railway Society, Melton Mowbray, UK, 14EL 2006, pp. 63–64

[edit] External links